Περιγραφή

BES mixed
Overhead composite, portable, heavy-duty bridge deck. The bridge is made of a frame of steel beams type IPE450 (according to DIN 1072 and DIN 8119) and intermediate beams of similar cross section. A 200mm thick reinforced concrete bridge C-20/25 is concreted on the frame deleted from the frame
| TYPE | DIMENSIONS | MODULES QTY |
CAPACITY | CELLS QTY |
| BES 9×3 | 9x3m | 2 | 60T | 6 |
| BES 14×3 | 14x3m | 3 | 60T | 8 |
| BES 18×3 | 18x3m | 3 | 60T | 8 |
* Possibility to build a bridge in the dimensions of the customer – upon request
Peripherals
Power cells
Fully stainless waterproof IP68 power cells, approved according to OIML60 & 4000d subdivisions

DESB (Double Ended Shear Beam)
Cargo receiving bearing system
The dynamite cells are installed in such a way that the loads are transferred to them through special devices called mount support. The mount supports are independent systems for mounting the power cells and at the same time receiving the loads from the weighing platform

Stainless steel / waterproof (IP65) digital electronic indicator BTS800

Digital electronic indicator VT300

Epson LX 350 Printer

The installation is carried out by the specialized staff of BONAROS SA.
The installation of the bridge is completed by its configuration, connection of peripherals (indicator, printer, coin acceptor, etc.) and its calibration (Calibration). At the end, the correct operation is checked, the demonstration and the training of the bridge operators are performed and the delivery of the user manuals in Greek.
Possibility to provide legalization certificates
All parts of the deck, including the power cells and their support systems, remain easily accessible after installation, providing seamless maintenance.
Installations





BES-U mixed
Overhead composite, portable, heavy-duty bridge deck. The bridge is made of metal perimeter frame type UPN 300 (according to DIN 1072 and DIN 8119) that surrounds the perimeter of the structure which is made of reinforced concrete C-20/25, 30cm thick boxed inside the steel frame.
| TYPE | DIMENSIONS | MODULES QTY |
CAPACITY | CELLS QTY |
| BES-U 9×3 | 9x3m | 2 | 60T | 6 |
| BES-U 14×3 | 14x3m | 3 | 60T | 8 |
| BES-U 18×3 | 18x3m | 3 | 60T | 8 |
* Possibility to build a bridge in the dimensions of the customer – upon request
Peripherals
Power cells
Fully stainless waterproof IP68 power cells, approved according to OIML60 & 4000d subdivisions.

DESB (Double Ended Shear Beam)
Cargo receiving bearing system
The dynamite cells are installed in such a way that the loads are transferred to them through special devices called mount support. The mount supports are independent systems for mounting the power cells and at the same time receiving the loads from the weighing platform.

Digital electronic indicator VT300

Epson LX 350 Printer

The installation is carried out by the specialized staff of BONAROS SA.
The installation of the bridge is completed by its configuration, connection of the peripherals (indicator, printer, coin acceptor, etc.) and its calibration (Calibration). At the end, the correct operation is checked, the demonstration and the training of the bridge operators are performed and the delivery of the user manuals in Greek.
Possibility to provide legalization certificates
All parts of the deck, including the power cells and their support systems, remain easily accessible after installation, providing seamless maintenance.
Installations




